A purchase contract or loan commitment for a commercial property usually calls for an ALTA/NSPS Land Title Survey. The harder part comes next, when someone has to decide which optional items to add. Table A is that menu of extras, and the ALTA survey requirements in Table A apply only to the items the client actually requests. The best list answers real questions in the deal and leaves out the rest. Commercial sites are often tight and their access can get complicated, so a careful list keeps the survey focused on what the buyer and lender need to know.
Match Table A Items to the Property Decision
Pick each Table A item by asking what decision it will support. A buyer, a lender and a business owner taking over a long-term lease don’t need the same facts, even on the same parcel. When you tie each item to a real question, the scope stays useful.
Think about how the deal will use the finished drawing. A buyer who plans to rely on a building’s size in pricing or rent talks may want the surveyor to measure building area. A buyer who worries about parking for future tenants may ask for a count of striped spaces. A lender may list specific items in its closing instructions, and those requests belong on the list as written.
Some items depend on outside information. The zoning items rely on a zoning report or letter that the client gives to the surveyor. If nobody plans to order that report, the zoning item may not make sense yet. Naming the person who will use each item keeps the list honest.
Review Site Conditions Before Finalizing Table A
Walk through what’s on the ground before you settle the list. Two commercial lots of the same size can call for very different items because of what sits on them. Existing buildings, shared driveways and buried lines all shape which extras earn their place.
A few site conditions tend to point toward certain items:
- Buildings close to a property line can justify measured building dimensions and distances to the line.
- Access across a neighbor’s land can make offsite easements that benefit the property worth showing.
- Parking that serves more than one business can call for a striped space count.
- Older sites with unclear utility routes may need observed utility evidence plus locate markings.
- A planned addition or regrade can make contours or spot elevations useful.
Talk with the surveyor about anything a site visit might miss. Underground tanks, informal parking deals with neighbors and planned tenant changes don’t always show up in the title commitment. Sharing them early helps the surveyor suggest items that fit.
Apply ALTA Survey Requirements Table A Selectively
Table A works best as a menu, so treat it that way. The 2026 ALTA/NSPS Minimum Standard Detail Requirements took effect on February 23, 2026, and they still keep these items optional. Each one you check adds research, field time or drafting to the job.
Requesting every item can slow the survey and raise the fee without giving anyone better answers. A parking count on a vacant pad site, or a zoning item with no zoning report behind it, adds cost and fills the drawing with details no one reads. A short, focused list also gives the title examiner less to sort through.
Leaving items out carries its own risk. A title company may want certain items before it offers some policy endorsements. A lender’s checklist can also name items the buyer would rather skip. Matching the ALTA survey requirements in Table A to those written requests, then adding only what the property calls for, gives you a list that holds up at closing.
Account for Commercial Property Conditions
Commercial sites bring a few conditions that can change the list. Many sit on small, irregular parcels with buildings near the lines. Others share access, parking or loading space with neighbors in dense commercial areas.
Land records add another layer. Hawaii keeps two recording systems, the Regular System and the Land Court system, and the Bureau of Conveyances handles both. The surveyor’s record research depends on which system covers the parcel, so tell the surveyor early which documents you already have. Leasehold property is also common in the state, and a ground lease may describe a lease area that differs from the full parcel.
Terrain and setting matter too. A sloped lot with a planned parking expansion may benefit from contours. A parcel near the shoreline may lead the lender to ask for the flood zone item. Pick the items that answer the questions this particular site raises, and skip the ones that don’t.
Confirm Requested Items Before Survey Fieldwork
Settle the Table A list in writing before the crew goes to the site. The best place for it is the survey proposal or contract. That way the surveyor prices the right work and plans one trip to cover it.
Send the surveyor the title commitment, the lender’s survey requirements and any zoning report you plan to use. Confirm the names of the parties who will receive the certification, since the surveyor certifies only to those parties. Ask the title company and lender to look over the list before work starts.
Late changes cost time. An item added after fieldwork may send the crew back out or force a revised drawing. A few extra days of planning at the start usually costs less than a second site visit near closing.
Frequently Asked Questions
Do I need to request every available ALTA Table A item?
No. Every item on Table A is optional, and the client and surveyor agree on which ones to include. The right set depends on the deal, the property and what the lender or title company asks for in writing.
Can different parties request different Table A items for the same property?
Yes. A buyer might care about building size while the lender focuses on flood zone status and the title company wants items tied to an endorsement. Pulling those requests into one list before the survey starts lets the surveyor deliver a single drawing that works for everyone.
Can Table A items affect the scope and cost of an ALTA survey?
Yes. Some items need extra record research or field measurements, and others need more drafting on the final drawing. Those added steps can raise the fee and stretch the schedule, so ask the surveyor how each item changes the quote.